Skip to content
DipanshuTechBuilding Digital. Driving Growth.

Mobile

App ModernizationSame App, Modern Stack.

App modernisation for the mobile apps that still work but cannot keep up — UIKit to SwiftUI, Views to Jetpack Compose, the data layer to the modern persistence library, the navigation to the new component, phased and shipped without a rewrite.

10+Years Experience
100+Projects Delivered
50+Expert Developers
20+Industries Served

Overview

App modernisation is a series of small migrations, not a rewrite

The most expensive app modernisation is the one that tries to rewrite the app from scratch. The rewrite takes twice as long, the feature parity is never quite right, and the new app ships with a regression the team did not know about. The work is to migrate one piece at a time, with the old piece running alongside the new until the new is trusted.

We do app modernisations as a series of focused migrations, each one aimed at the next piece the team needs. The migrations are flagged, tested, shipped behind a feature flag and rolled back if they drift. The app becomes modern a piece at a time, without a freeze on new features.

This is the wrong engagement if the app is small enough to be replaced by a new build. The cheapest modernisation is the one where you do not have to modernise.

  • No Big Bang — A phased migration, not a single rewrite, with the old app running alongside the new.
  • Risk Managed — The riskiest part of the app is migrated first, when the team has the most attention.
  • Feature Flags — The new code ships behind a flag, with the rollback path tested.
  • Architectured for Next — The next feature is built against the modern stack, not the legacy one.

What we deliver

Everything included in our app modernization

UIKit to SwiftUI

A phased migration from UIKit to SwiftUI, with both running side by side.

Views to Jetpack Compose

A phased migration from Android Views to Jetpack Compose, in steps that ship.

Data Layer Modernisation

Core Data to SwiftData, Room to SQLDelight, the data layer the next feature needs.

Navigation Modernisation

A migration to the modern navigation component, with deep links preserved.

State Management Refresh

A migration to the modern state management approach, without a rewrite of every screen.

Architecture & Module Boundaries

Clean architecture, modularisation and the seams the next feature needs.

Our process

A proven process for successful delivery

  1. 01

    Discover

    We audit the app, the architecture and the riskiest parts of the codebase.

  2. 02

    Plan & Design

    We write the migration plan, the flag strategy and the cutover plan.

  3. 03

    Develop

    We build the new piece, with the old piece still running in production.

  4. 04

    Deploy

    We flip the flag, watch the metrics and roll back if it drifts.

  5. 05

    Optimize & Grow

    We move to the next piece, with the metrics as the input.

Technology

Built with a stack that stays maintainable

iOS

  • Swift
  • SwiftUI
  • Combine
  • SwiftData

Android

  • Kotlin
  • Jetpack Compose
  • Room
  • Coroutines

Architecture

  • Clean architecture
  • Modularisation
  • Feature flags

What you can expect

Per Migration Phase
4-8 wksPer Migration Phase
Data Preserved
100%Data Preserved
Big-Bang Rewrites
ZeroBig-Bang Rewrites
Faster Feature Delivery Post-Modernisation
2-3xFaster Feature Delivery Post-Modernisation

FAQs

Questions we get asked

Something not covered here? Ask us directly.

The riskiest part of the app is the first candidate, because that is where the legacy code is most likely to break. The second candidate is the part of the app that is blocking new features. The migration is sequenced against risk and value, not against a wishlist.

No, when the migration is done right. The new piece ships behind a feature flag, with the old piece still serving traffic. The flag is flipped for a small percentage, then for everyone, with the metrics watched at each step. The user experience stays the same, and the new piece gets the chance to prove itself.

A written data migration plan with named owners, a test cut with a small subset of records, a parallel run for at least one full release cycle, and a recovery path that does not require restoring the legacy code. The data is preserved, the old code is decommissioned in its own time.

Yes, the same way. A Flutter or React Native app can be modernised one piece at a time, with the new piece shipped behind a feature flag and the old piece decommissioned in its own time. The principle is the same, regardless of the framework.

Ready to start your app modernization project?Let’s scope it together.

Tell us the outcome you need. We’ll come back with an approach, a timeline and a written estimate.